COVID hit my project pretty hard.. I was on track to do things at my own pace.. and do it almost entirely self- supported but..
I need your help!
Right now, I need to pick up some much- needed materials so that I can finish the Lengthening Process. I’ve already sourced and received my first Propel Style pedal drive.. I’ve also ripped a URT
off an old Gary Fisher Joshua.. both parts are sitting in The Boatshed. I have, also, reconfigured the Captains Seat concept.. it was initially going to be a modified hoverboard seat.. now it’s going to be more of a custom and purpose- made “Zip Chair
” structure. All of this needs to be installed and/ or built this summer/ fall so that I can lower the boat and start work on The Cabin and Fly Bridge superstructure.
Linkage Coming Shortly